Space 18 Singapore Details, Specifications and Site Map
SPACE 18 PROJECT DETAILS
Project Name: | SPACE 18 |
Address: | 18 Lorong Ampas Singapore 328779 |
Project Description: | PROPOSED NEW ERECTION OF A BLOCK OF 6-STOREY MULTI-USER CLEAN INDUSTRIAL (B1) DEVELOPMENT (TOTAL: 46 STRATA UNITS) WITH TEMPORARY INDUSTRIAL CANTEEN |
Developer: | JVA WHAMPOA PTE LTD ( Reg. No.: 202308573E) |
Tenure: | Freehold |
Land Lot No.: | MK17-05518C |
Mastar Plan 2014: | Industrial B1 zone |
District: | D12 |
Total Site Area: | Approx: 3,426.7 sqm, ie 36,885 sqft |
Total No of Units: | 47 units (included 1 temporary industrial canteen) |
Expected Date of Vacant Possession: | 31-Dec-2026 |
Expected Date of Legal Completion: | 31-Dec-2029 |
Floor to Floor Height: | 1. 1st floor 7.0M, 2nd-6th floor 6.3M |
Parking and Loading/Unloading lots: | 1. 3 Loading/unloading bay at 1st floor 2. 26 car spaces at 1st floor (include 1 accessible lot) 3. 2 motocycle lots 4. 28 bicycle lots |
Electrical Installation: | 1. Industrial Canteen: 200KVA, 2. Clean Industrial units: 60KVA |
Lift Installations: | 1 service lift, 2 passage/fire lifts |
Floor loading: | 7.5KN/m2 (air-con ledge 3KN/m2) |
Share Value: | TBA |
Est. Maintenance Fee (per unit): | Industrial Canteen: $4000/mth, Industrial Clean units $800/unit/month |
Others | Curtain Wall glazing system for some units |
SPACE 18 SITE MAP
SPACE 18 SPECIFICATIONS
Foundation
Generally reinforced concrete bored pile foundation
Structure
Ground floor slab – Generally cast-in-situ Reinforced Concrete Column-Beam-Slab frame system
Typical floor slab - Generally flat slab design, consisting of cast-in-situ reinforced concrete column with cast-in-situ post-tensioned slab system
Roof
Generally flat slab design, consisting of cast-in-situ reinforced concrete column with cast-in-situ post-tensioned slab system
Appropriate waterproofing and insulation system are provided.
Internal Wall
Generally lightweight concrete panel/block wall/ impact-resistant drywall with skim coat and emulsion paint
Toilets: Homogenous/porcelain wall tiles to toilets to 2400mm height and emulsion paint on skim coat above 2400mm height.
Lift Lobbies: Homogeneous/porcelain wall tiles/ emulsion paint
Common corridors: Emulsion Paint with 100mm high tile skirting
External Wall
Reinforced concrete/lightweight concrete panel/block wall where appropriate with skim coat and painting.
Unitized Curtain Wall system
Aluminum & Glass cladding
Floor Loading
Industrial Canteen: 7.5 kN/m2
Clean Industrial Units:7.5kN/m2
Aircon ledges: 3.0 kN/m2
Floor to Floor Height
1st storey: 7.0m
2nd to 6th storey: 6.3m
Windows
Aluminum-framed glazing / Aluminum louvres/ Aluminum-framed window system with glazing/ Aluminum screen
Doors
Clean Industrial Units: Metal door and frame with paint finish
Toilets: Flush timber door with lockset in laminate finish
Lift lobbies/common areas: Metal door and frame with paint finish
Ceiling
Industrial Canteen: Skim coat finish only
Clean Industrial Units: Emulsion paint finish
Toilets: Emulsion paint finish
Lift lobbies/ Common areas: Plaster ceiling/ Emulsion paint finish
Floor Finishes
Industrial Canteen: Broom finish concrete
Clean Industrial Units: Broom finish concrete
Toilets: Homogeneous/porcelain tile
Lift lobbies / Common areas: Homogeneous/porcelain tile
Electrical Supply
Industrial Canteen: 200A/3 phase isolator
Clean Industrial Units: 60A/3 phase isolator
Gas Supply
Industrial Canteen: LPG cylinder storage station provided. Future LPG cylinder supplier contracted by canteen operator shall engage their PE for submission and application to authorities for approval of LPG supply system to canteen.
Fire Protection
Sprinkler, manual & automatic fire alarm, dry risers, hose reel systems, fire extinguishers, voice communication systems, emergency lighting, exit signs are provided in compliance with statutory requirements
Air Conditioning/Mechanical
Industrial Canteen: Natural/mechanical ventilation. Future canteen operator to engage their PE to design and submit kitchen mechanical exhaust system and air conditioning system ( if any) to authorities for approval.
Clean Industrial Units: Natural/mechanical ventilation
Toilets: Natural with mechanical exhaust
Lift lobbies / Common areas: Air-conditioning /Mechanical ventilation in compliance to authority requirements for designated areas
Lifts
1 service lift and 2 passenger/fire lifts
Plumbing and Sanitary
Accessible toilets in compliance with statutory requirements in Clean Industrial Units.,
Sanitary and plumbing installation systems are provided in compliance with Government Authority requirements.
Telecommunication
Infrastructure (cable tray and/or trunking and/or conduit) for telecommunication is provided in compliance with IDA requirements.
Lightning Protection
Lightning Protection System provided in compliance with statutory requirements
Loading Bays
3 loading bays at 1st storey
Parking
25 car spaces at 1st storey
1 accessible car space at 1st storey
2 motorcycle lots at 1st storey
28 bicycle lots at 1st storey
Refuse Disposal
Bin centre at 1st storey
Exhaust Shaft
Dedicated exhaust shaft from Industrial Canteen to rooftop
Have a Chat With Us
CosySingapore Consultants
Commercial Properties Singapore
8.00 am to 10.00 pm
Hotline: +65 6100 8123
Email: CosySingapore@gmail.com
Scan this code for Whatsapp