Space 21 Singapore Specifications, Fact Sheet and Details
Project Detail
Project Detail
Project Name | SPACE 21 | |||
Road | LOR 21 GEYLANG | |||
Location | Local | |||
District | D14 - GEYLANG, EUNOS | |||
Region | Central Region | |||
Broad Region | Rest of Central Region (RCR) | |||
Country | Singapore | |||
Category | INDUSTRIAL | |||
Expected Top | 30 JUNE 2023 | |||
Expected Date Legal Completion | 30 JUNE 2023 | |||
Tenure | FREEHOLD | |||
Land Size Area | 15,364 sqft | |||
Site Use | Industrial | |||
Mukim Lot No | MK24-03957N | |||
No Lift Lobbies | 1 service lift, 1 passage lift | |||
Total No Units | 20 units (included one industrial canteen) | |||
Addresses |
|
Have a Chat With Us
CosySingapore Consultants
Commercial Properties Singapore
8.00 am to 10.00 pm
Hotline: +65 6100 8123
Email: CosySingapore@gmail.com
Scan this code for Whatsapp
Building Specifications
Foundation
Generally reinforced concrete bored pile foundation
Structure
Cast in-Situ reinforced concrete frame
Roof
Reinforced concrete flat Rrof with appropriate waterproofing and insulation system and metal roofing over the factory units
Internal Wall
Generally lightweight concrete panel/block wall/ impact-resistant drywall with skim coat and emulsion paint
Homogenous wall tiles to toilets to 2400mm height and emulsion paint on skim coat above
2400mm height.
Homogeneous wall tile to lift lobbies
External Wall
Reinforced concrete/lightweight concrete panel/block wall where appropriate with skim coat and painting.
Floor Loading
Factory floor:7.5kN/m2
Mezzanine floor: 3.0KN/m2
Floor to Floor Height
1st storey: 5.185m
2nd to 5th storey: 7.0m
Windows
Aluminum-framed glazing / Aluminum louvres/ Aluminum-framed window system with glazing
Doors
Approved timber door with quality lockset to main entrance of units
Slide and fold PVC door with lockset to toilets
Glazing at 1st storey where applicable
Ceiling
Units: Skim coat and emulsion paint finish
Toilets: Suspended ceiling
Common areas: Plaster and emulsion paint finish/suspended ceiling
Floor Finishes
Generally power float concrete floor to all areas except lift lobbies and toilets
Homogeneous tile to lift lobbies, common corridor and toilets
Electrical Supply
60A 3Phase Isolator provided to individual unit
KWH Meter located inside the common electrical riser
Gas Supply
There is no gas provision to the building
Fire Protection
Sprinkler, fire alarm , dry risers, hose reel systems, fire extinguishers, voice communication systems, emergency lighting, exit signs are provided in compliance with statutory requirements
Air Conditioning/Mechanical
Provision of air conditioning to lift lobbies
Mechanical ventilation in compliance to authority requirements for designated areas
Lifts
1 service lift and 1 passenger/fire lift
Plumbing and Sanitary
Accessible toilets in compliance with statutory requirements
Units: 1 water closet; 1 wall-hung wash basin with mixer tap; 1 bidet spray; 1 toilet paper holder
Sanitary and plumbing installation systems are provided in compliance with Government Authority requirements
Piping works from meter compartment to unit with cap off at unit entrance
Telecommunication
Infrastructure( cable tray and/or trunking and/or conduit) for telecommunication is provided in compliance with IDA requirements
Lightning Protection
Lightning Protection System provided in compliance with statutory requirements
PA System
Voice Communication system provided in compliance with statutory requirements;
2 speakers provided per individual unit;
Loading Bays
2 loading bays at 1st storey
Car Parks
6 car spaces inclusive of accessible lot for disabled at 1st storey
Refuse Disposal
One common bin point at 1st storey